Energy UNITS FOR DOUBLE-SCISSORS LIFT

General Description
Equipped with all the zero leak bidirectional checking sole-noid valves, this electrical power unit is designed for your operation of two independent circuits. Which are respectively for the most important and subordinate platforms in the double scissors lift. Two cut-off valves are applied for decreasing the machine manually in case of electrical power loss. If more independent circuits are required for the application please contact us for availability.
Remark: 1. Please seek the advice of our product sales engineer to the distinctive pump displacement, motor energy or tank capability.
two. CSA or UL licensed motors can be found upon request.
Particular Notes
one. The AC motor is of S3 duty cycle, which might only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean all the hydraulic parts concerned ahead of installation of the electrical power unit.
three. Viscosity of the oil shoud be 15~46 cst,plus the oil must be clean and cost-free of impurities,N46 hydraulic oil is advisable.
four. The electrical power unit should be mounted vertically.
5. Check the oil level during the tank following the initial operating on the energy unit.
6. Oil transforming is required after the original one hundred operation hrs,afterwards the moment each and every 3000 hrs.

태그:

최신 글

웜 리듀서

당사는 기계 제품 분야의 선도적인 웜 감속기 제조업체, 공급업체 및 수출업체로서 웜 감속기를 비롯한 다양한 제품을 제공합니다.

자세한 사항은 저희에게 문의해 주세요.

우편: [email protected]

웜 감속기 제조업체, 공급업체, 수출업체