{"id":1381,"date":"2021-01-18T04:54:27","date_gmt":"2021-01-18T04:54:27","guid":{"rendered":"http:\/\/worm-reducers.xyz\/?p=1381"},"modified":"2022-12-29T01:53:08","modified_gmt":"2022-12-29T01:53:08","slug":"energy-units-for-double-scissors-lift","status":"publish","type":"post","link":"https:\/\/worm-reducers.xyz\/bs\/energy-units-for-double-scissors-lift\/","title":{"rendered":"Energy UNITS FOR DOUBLE-SCISSORS LIFT"},"content":{"rendered":"<p>General Description<br \/>Equipped with all the zero leak bidirectional checking sole-noid valves,  this  electrical power  unit  is  designed for your operation of  two independent circuits.  Which  are  respectively for the most important and subordinate platforms in the double scissors lift. Two  cut-off  valves are applied for decreasing the machine manually in case of electrical power loss. If more independent circuits are required for the application please contact us for availability.<br \/>Remark:  1. Please seek the advice of our product sales engineer to the distinctive pump displacement, motor energy or tank capability.<br \/>two. CSA or UL licensed motors can be found upon request.<br \/>Particular Notes<br \/>one.\tThe AC motor is of S3 duty cycle, which might only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.<br \/>2.\tClean all the hydraulic parts concerned <img decoding=\"async\" src=\"https:\/\/img.hzpt.com\/1207\/POWER%20UNITS%20FOR%20DOUBLE-SCISSORS%20LIFT1.jpg\" align=\"left\" width=\"209\" style=\"padding:10px;\"\/>ahead of installation of  the electrical power unit.<br \/>three.\tViscosity of the oil shoud be 15~46 cst,plus the oil must be clean and cost-free of impurities,N46 hydraulic oil is advisable.<br \/>four.\tThe electrical power unit should be mounted vertically.<br \/>5.\tCheck the oil level during the tank following the initial operating on the energy unit.<br \/>6.\tOil transforming is required after the original one hundred operation hrs,afterwards the moment each and every 3000 hrs.<\/p>","protected":false},"excerpt":{"rendered":"<p>General DescriptionEquipped with all the zero leak bidirectional checking sole-noid valves, this electrical power unit is designed for your operation of two independent circuits. Which are respectively for the most important and subordinate platforms in the double scissors lift. Two cut-off valves are applied for decreasing the machine manually in case of electrical power loss. [&hellip;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1381","post","type-post","status-publish","format-standard","hentry","category-worm-reducers"],"_links":{"self":[{"href":"https:\/\/worm-reducers.xyz\/bs\/wp-json\/wp\/v2\/posts\/1381","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/worm-reducers.xyz\/bs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/worm-reducers.xyz\/bs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/worm-reducers.xyz\/bs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/worm-reducers.xyz\/bs\/wp-json\/wp\/v2\/comments?post=1381"}],"version-history":[{"count":1,"href":"https:\/\/worm-reducers.xyz\/bs\/wp-json\/wp\/v2\/posts\/1381\/revisions"}],"predecessor-version":[{"id":1382,"href":"https:\/\/worm-reducers.xyz\/bs\/wp-json\/wp\/v2\/posts\/1381\/revisions\/1382"}],"wp:attachment":[{"href":"https:\/\/worm-reducers.xyz\/bs\/wp-json\/wp\/v2\/media?parent=1381"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/worm-reducers.xyz\/bs\/wp-json\/wp\/v2\/categories?post=1381"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/worm-reducers.xyz\/bs\/wp-json\/wp\/v2\/tags?post=1381"}],"curies":[{"name":"radni list","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}